[{"data":1,"prerenderedAt":1008},["ShallowReactive",2],{"feature-catalog":3},[4,107,189,271,353,435,517,599,681,763,845,926],{"id":5,"title":6,"body":7,"category":96,"description":13,"extension":97,"featured":98,"icon":99,"keywords":100,"meta":102,"navigation":98,"path":103,"seo":104,"stem":105,"__hash__":106},"features\u002Ffeatures\u002Fdigital-lift-asset-registry.md","Digital Elevator Asset Registry",{"type":8,"value":9,"toc":86},"minimark",[10,14,19,22,26,29,33,36,40,43,47,66,70,73],[11,12,13],"p",{},"Keep a central record for each elevator with technical details, installation context, contract coverage and service history.",[15,16,18],"h2",{"id":17},"give-every-lift-a-consistent-profile","Give every lift a consistent profile",[11,20,21],{},"Maintain a unique Lift ID, site, customer, capacity, speed, drive and installation details.",[15,23,25],{"id":24},"keep-warranty-and-maintenance-context-connected","Keep warranty and maintenance context connected",[11,27,28],{},"Link warranty periods, active contracts, visits and breakdown history where supported.",[15,30,32],{"id":31},"find-historical-information-faster","Find historical information faster",[11,34,35],{},"Use a chronological service ledger to review previous repairs, inspections and component replacements.",[15,37,39],{"id":38},"protect-sensitive-technical-information","Protect sensitive technical information",[11,41,42],{},"Restrict access to confidential technical records and secrets through appropriate permissions; do not store sensitive credentials in plain text.",[15,44,46],{"id":45},"key-capabilities","Key capabilities",[48,49,50,54,57,60,63],"ul",{},[51,52,53],"li",{},"Unique lift records and technical profiles",[51,55,56],{},"Customer\u002Fsite association",[51,58,59],{},"Warranty and contract records",[51,61,62],{},"Service and breakdown history",[51,64,65],{},"Controlled access to technical documents",[15,67,69],{"id":68},"see-how-it-fits-your-workflow","See how it fits your workflow",[11,71,72],{},"Plan the asset structure and data migration around your existing lift IDs, customer sites, contract records and historic maintenance sheets.",[11,74,75,80,81,85],{},[76,77,79],"a",{"href":78},"\u002Fdemo","Book a product demo"," or ",[76,82,84],{"href":83},"\u002Fcontact","contact the Nexvator team"," to discuss your requirements.",{"title":87,"searchDepth":88,"depth":88,"links":89},"",2,[90,91,92,93,94,95],{"id":17,"depth":88,"text":18},{"id":24,"depth":88,"text":25},{"id":31,"depth":88,"text":32},{"id":38,"depth":88,"text":39},{"id":45,"depth":88,"text":46},{"id":68,"depth":88,"text":69},"Asset Lifecycle","md",true,"building",[6,101],"Elevator ERP software",{},"\u002Ffeatures\u002Fdigital-lift-asset-registry",{"title":6,"description":13},"features\u002Fdigital-lift-asset-registry","ZZYAqiDnCQp27evtlMgh1wAdMo7IFbB3e78_Y8qUMig",{"id":108,"title":109,"body":110,"category":181,"description":114,"extension":97,"featured":98,"icon":182,"keywords":183,"meta":184,"navigation":98,"path":185,"seo":186,"stem":187,"__hash__":188},"features\u002Ffeatures\u002Famc-cmc-management.md","Elevator AMC & CMC Management",{"type":8,"value":111,"toc":173},[112,115,119,122,126,129,133,136,140,143,145,162,164,167],[11,113,114],{},"Track maintenance contracts, service schedules, renewal dates, billing milestones and the elevators covered by each agreement.",[15,116,118],{"id":117},"keep-contract-obligations-in-view","Keep contract obligations in view",[11,120,121],{},"Store contract type, coverage, customer, linked assets, dates and commercial details in an organized record.",[15,123,125],{"id":124},"plan-recurring-service-visits","Plan recurring service visits",[11,127,128],{},"Configure preventive maintenance schedules around supported contract frequencies and service rules.",[15,130,132],{"id":131},"surface-upcoming-renewals","Surface upcoming renewals",[11,134,135],{},"Use renewal reminders and contract status visibility to help teams plan customer conversations before expiry.",[15,137,139],{"id":138},"connect-contract-and-service-history","Connect contract and service history",[11,141,142],{},"Link maintenance activity and asset information so office staff can review the history behind a contract.",[15,144,46],{"id":45},[48,146,147,150,153,156,159],{},[51,148,149],{},"AMC and CMC contract records",[51,151,152],{},"Multi-elevator contract association",[51,154,155],{},"Renewal and payment reminders",[51,157,158],{},"Recurring service scheduling",[51,160,161],{},"Contract documents and service history",[15,163,69],{"id":68},[11,165,166],{},"Review how your team defines coverage, visit frequency, renewals, billing schedules and exception handling during a personalized demo.",[11,168,169,80,171,85],{},[76,170,79],{"href":78},[76,172,84],{"href":83},{"title":87,"searchDepth":88,"depth":88,"links":174},[175,176,177,178,179,180],{"id":117,"depth":88,"text":118},{"id":124,"depth":88,"text":125},{"id":131,"depth":88,"text":132},{"id":138,"depth":88,"text":139},{"id":45,"depth":88,"text":46},{"id":68,"depth":88,"text":69},"Maintenance Contracts","refresh-cw",[109,101],{},"\u002Ffeatures\u002Famc-cmc-management",{"title":109,"description":114},"features\u002Famc-cmc-management","nRUdtHAp8Cryh1mXPJqvkHcZ_iHhaepdUvyovCa8XSY",{"id":190,"title":191,"body":192,"category":263,"description":196,"extension":97,"featured":98,"icon":264,"keywords":265,"meta":266,"navigation":98,"path":267,"seo":268,"stem":269,"__hash__":270},"features\u002Ffeatures\u002Fbreakdown-management.md","Elevator Breakdown & Complaint Management",{"type":8,"value":193,"toc":255},[194,197,201,204,208,211,215,218,222,225,227,244,246,249],[11,195,196],{},"Register service complaints, prioritize response, assign technicians and preserve a clear record from diagnosis to resolution.",[15,198,200],{"id":199},"create-a-traceable-complaint-record","Create a traceable complaint record",[11,202,203],{},"Capture the customer, elevator, reported issue, priority, time and current status.",[15,205,207],{"id":206},"route-work-to-the-right-team","Route work to the right team",[11,209,210],{},"Assign a technician and track acceptance and progress using the configured workflow.",[15,212,214],{"id":213},"document-diagnosis-and-repair","Document diagnosis and repair",[11,216,217],{},"Record root-cause notes, parts used, work performed and outstanding actions.",[15,219,221],{"id":220},"review-service-performance","Review service performance",[11,223,224],{},"Structured timestamps and status history can support response and resolution reporting when configured consistently.",[15,226,46],{"id":45},[48,228,229,232,235,238,241],{},[51,230,231],{},"Breakdown and complaint registration",[51,233,234],{},"Priority and assignment workflow",[51,236,237],{},"Technician acceptance and status updates",[51,239,240],{},"Diagnosis, parts and resolution notes",[51,242,243],{},"Service history and response reporting",[15,245,69],{"id":68},[11,247,248],{},"Confirm which notification channels, escalation rules and service-level reports are available for your deployment before relying on them operationally.",[11,250,251,80,253,85],{},[76,252,79],{"href":78},[76,254,84],{"href":83},{"title":87,"searchDepth":88,"depth":88,"links":256},[257,258,259,260,261,262],{"id":199,"depth":88,"text":200},{"id":206,"depth":88,"text":207},{"id":213,"depth":88,"text":214},{"id":220,"depth":88,"text":221},{"id":45,"depth":88,"text":46},{"id":68,"depth":88,"text":69},"Breakdown Service","siren",[191,101],{},"\u002Ffeatures\u002Fbreakdown-management",{"title":191,"description":196},"features\u002Fbreakdown-management","u-MCOkzu6cvtSqvy1tGdCewHrijDi5sOzlHE7usg4m0",{"id":272,"title":273,"body":274,"category":345,"description":278,"extension":97,"featured":98,"icon":346,"keywords":347,"meta":348,"navigation":98,"path":349,"seo":350,"stem":351,"__hash__":352},"features\u002Ffeatures\u002Felevator-crm.md","Elevator CRM & Lead Management",{"type":8,"value":275,"toc":337},[276,279,283,286,290,293,297,300,304,307,309,326,328,331],[11,277,278],{},"Capture enquiries, organize follow-ups and give your sales team a clearer path from first conversation to technical enquiry.",[15,280,282],{"id":281},"keep-every-enquiry-visible","Keep every enquiry visible",[11,284,285],{},"Centralize prospects, customer details, enquiry source, status and sales ownership instead of spreading information across spreadsheets and individual inboxes.",[15,287,289],{"id":288},"build-a-consistent-follow-up-process","Build a consistent follow-up process",[11,291,292],{},"Use reminders, interaction notes and pipeline stages to help representatives know what needs attention next.",[15,294,296],{"id":295},"connect-field-visits-with-sales-records","Connect field visits with sales records",[11,298,299],{},"Capture site visit details and geolocation where supported by the mobile workflow, keeping customer and site context connected.",[15,301,303],{"id":302},"reduce-duplicate-entry","Reduce duplicate entry",[11,305,306],{},"The product workflow is designed to help qualified leads move into technical enquiry and quotation processes with less re-keying.",[15,308,46],{"id":45},[48,310,311,314,317,320,323],{},[51,312,313],{},"Lead capture and assignment",[51,315,316],{},"Follow-up reminders and call\u002Fmeeting notes",[51,318,319],{},"Pipeline status tracking",[51,321,322],{},"Site visit records and location context",[51,324,325],{},"Lead-to-enquiry handoff",[15,327,69],{"id":68},[11,329,330],{},"Give sales managers a clearer view of pipeline activity, ownership and next steps. Use the demo to review how lead sources, territories and sales stages could map to your process.",[11,332,333,80,335,85],{},[76,334,79],{"href":78},[76,336,84],{"href":83},{"title":87,"searchDepth":88,"depth":88,"links":338},[339,340,341,342,343,344],{"id":281,"depth":88,"text":282},{"id":288,"depth":88,"text":289},{"id":295,"depth":88,"text":296},{"id":302,"depth":88,"text":303},{"id":45,"depth":88,"text":46},{"id":68,"depth":88,"text":69},"Sales & CRM","target",[273,101],{},"\u002Ffeatures\u002Felevator-crm",{"title":273,"description":278},"features\u002Felevator-crm","CGoRQ7UBe8iTBHhAg5XXuS_J3hCHO6sme_BToFsRWKc",{"id":354,"title":355,"body":356,"category":427,"description":360,"extension":97,"featured":98,"icon":428,"keywords":429,"meta":430,"navigation":98,"path":431,"seo":432,"stem":433,"__hash__":434},"features\u002Ffeatures\u002Finstallation-project-management.md","Elevator Installation Project Management",{"type":8,"value":357,"toc":419},[358,361,365,368,372,375,379,382,386,389,391,408,410,413],[11,359,360],{},"Coordinate installation phases, site tasks, milestones, materials and quality review from shaft readiness through commissioning.",[15,362,364],{"id":363},"make-project-progress-easier-to-understand","Make project progress easier to understand",[11,366,367],{},"Represent work as phases, stages and tasks with ownership, status and due dates.",[15,369,371],{"id":370},"manage-blockers-with-context","Manage blockers with context",[11,373,374],{},"Record reasons for blocked work so project managers can distinguish genuine site constraints from missed updates.",[15,376,378],{"id":377},"capture-execution-evidence","Capture execution evidence",[11,380,381],{},"Keep task photographs, checklists and documents connected to the relevant stage for review.",[15,383,385],{"id":384},"control-handover","Control handover",[11,387,388],{},"Organize commissioning steps, customer sign-off, handover documents and warranty records as part of the project workflow.",[15,390,46],{"id":45},[48,392,393,396,399,402,405],{},[51,394,395],{},"Phase, stage and task hierarchy",[51,397,398],{},"Task assignment and status visibility",[51,400,401],{},"Blocker notes and audit context",[51,403,404],{},"Photo\u002Fdocument proof and supervisor reviews",[51,406,407],{},"Commissioning and handover records",[15,409,69],{"id":68},[11,411,412],{},"Plan a demonstration around your real installation stages, team roles, milestone dates and customer handover requirements.",[11,414,415,80,417,85],{},[76,416,79],{"href":78},[76,418,84],{"href":83},{"title":87,"searchDepth":88,"depth":88,"links":420},[421,422,423,424,425,426],{"id":363,"depth":88,"text":364},{"id":370,"depth":88,"text":371},{"id":377,"depth":88,"text":378},{"id":384,"depth":88,"text":385},{"id":45,"depth":88,"text":46},{"id":68,"depth":88,"text":69},"Projects & Installation","construction",[355,101],{},"\u002Ffeatures\u002Finstallation-project-management",{"title":355,"description":360},"features\u002Finstallation-project-management","rPLcqFEFDWEB7d2-Bm_ycM27Eo6I-H53Znd6SQTY28A",{"id":436,"title":437,"body":438,"category":509,"description":442,"extension":97,"featured":98,"icon":510,"keywords":511,"meta":512,"navigation":98,"path":513,"seo":514,"stem":515,"__hash__":516},"features\u002Ffeatures\u002Finventory-procurement.md","Elevator Inventory & Procurement Management",{"type":8,"value":439,"toc":501},[440,443,447,450,454,457,461,464,468,471,473,490,492,495],[11,441,442],{},"Connect project material requirements with purchasing, warehouse stock, goods receipts and site delivery records.",[15,444,446],{"id":445},"plan-materials-around-projects","Plan materials around projects",[11,448,449],{},"Maintain project-level bill of materials and record material requirements from the site.",[15,451,453],{"id":452},"make-purchasing-traceable","Make purchasing traceable",[11,455,456],{},"Organize vendors, purchase orders, received quantities and discrepancies.",[15,458,460],{"id":459},"track-stock-movement","Track stock movement",[11,462,463],{},"Maintain warehouse balances and a history of receipts, issues, returns and adjustments.",[15,465,467],{"id":466},"confirm-site-deliveries","Confirm site deliveries",[11,469,470],{},"Use delivery challans and site receipt confirmation to improve visibility into what was dispatched and received.",[15,472,46],{"id":45},[48,474,475,478,481,484,487],{},[51,476,477],{},"Project bill of materials",[51,479,480],{},"Material requisitions and purchase orders",[51,482,483],{},"Goods Received Notes",[51,485,486],{},"Warehouse stock and transaction history",[51,488,489],{},"Delivery challans, returns and scrap records",[15,491,69],{"id":68},[11,493,494],{},"Validate your warehouse structure, part catalogue, tax rules, material approval process and opening-stock migration plan during implementation planning.",[11,496,497,80,499,85],{},[76,498,79],{"href":78},[76,500,84],{"href":83},{"title":87,"searchDepth":88,"depth":88,"links":502},[503,504,505,506,507,508],{"id":445,"depth":88,"text":446},{"id":452,"depth":88,"text":453},{"id":459,"depth":88,"text":460},{"id":466,"depth":88,"text":467},{"id":45,"depth":88,"text":46},{"id":68,"depth":88,"text":69},"Inventory & Procurement","boxes",[437,101],{},"\u002Ffeatures\u002Finventory-procurement",{"title":437,"description":442},"features\u002Finventory-procurement","-uAR7h832NobGe6bjs4FOOxT3YH8qw4kkga7zHdIMR4",{"id":518,"title":519,"body":520,"category":591,"description":524,"extension":97,"featured":98,"icon":592,"keywords":593,"meta":594,"navigation":98,"path":595,"seo":596,"stem":597,"__hash__":598},"features\u002Ffeatures\u002Fpreventive-maintenance.md","Elevator Preventive Maintenance Software",{"type":8,"value":521,"toc":583},[522,525,529,532,536,539,543,546,550,553,555,572,574,577],[11,523,524],{},"Plan routine service visits and standardize digital inspection records for maintenance teams working at customer sites.",[15,526,528],{"id":527},"prepare-teams-before-a-visit","Prepare teams before a visit",[11,530,531],{},"Keep assigned work, site information and maintenance context available to the technician.",[15,533,535],{"id":534},"standardize-inspections","Standardize inspections",[11,537,538],{},"Use digital checklists for relevant inspection areas such as machine room, car top, shaft, pit and cabin.",[15,540,542],{"id":541},"document-work-completed","Document work completed",[11,544,545],{},"Attach observations, photographs, parts used and technician remarks to the visit record.",[15,547,549],{"id":548},"share-a-clear-service-record","Share a clear service record",[11,551,552],{},"The product scope includes service report PDFs and customer sign-off workflows, depending on the deployed release.",[15,554,46],{"id":45},[48,556,557,560,563,566,569],{},[51,558,559],{},"Scheduled preventive maintenance visits",[51,561,562],{},"Digital safety and service checklists",[51,564,565],{},"Technician check-in and check-out",[51,567,568],{},"Photo evidence and visit remarks",[51,570,571],{},"Customer sign-off and service report",[15,573,69],{"id":68},[11,575,576],{},"Bring your existing checklist and preventive-maintenance schedule to the demo so the team can review how they map to the product.",[11,578,579,80,581,85],{},[76,580,79],{"href":78},[76,582,84],{"href":83},{"title":87,"searchDepth":88,"depth":88,"links":584},[585,586,587,588,589,590],{"id":527,"depth":88,"text":528},{"id":534,"depth":88,"text":535},{"id":541,"depth":88,"text":542},{"id":548,"depth":88,"text":549},{"id":45,"depth":88,"text":46},{"id":68,"depth":88,"text":69},"Maintenance & Inspection","wrench",[519,101],{},"\u002Ffeatures\u002Fpreventive-maintenance",{"title":519,"description":524},"features\u002Fpreventive-maintenance","qthF9L8_WAglSLr0jEaGNr6PAlozTZXQE2WQkauTASQ",{"id":600,"title":601,"body":602,"category":673,"description":606,"extension":97,"featured":98,"icon":674,"keywords":675,"meta":676,"navigation":98,"path":677,"seo":678,"stem":679,"__hash__":680},"features\u002Ffeatures\u002Ffinance-payment-management.md","Elevator Project Finance & Payment Tracking",{"type":8,"value":603,"toc":665},[604,607,611,614,618,621,625,628,632,635,637,654,656,659],[11,605,606],{},"Connect customer collections, project milestones, supplier costs and outstanding balances to elevator project records.",[15,608,610],{"id":609},"align-payment-schedules-with-delivery","Align payment schedules with delivery",[11,612,613],{},"Record payment milestones such as booking advance, material dispatch, mechanical completion and handover.",[15,615,617],{"id":616},"track-receivables-and-receipts","Track receivables and receipts",[11,619,620],{},"Keep invoice, receipt, credit-note and outstanding-payment information organized.",[15,622,624],{"id":623},"understand-project-costs","Understand project costs",[11,626,627],{},"Record relevant project expenses and vendor or subcontractor payments against the job.",[15,629,631],{"id":630},"improve-collection-follow-up","Improve collection follow-up",[11,633,634],{},"Give the team a consolidated view of due amounts and payment activity based on entered records.",[15,636,46],{"id":45},[48,638,639,642,645,648,651],{},[51,640,641],{},"Milestone-based collection agreements",[51,643,644],{},"Invoices, receipts and credit notes",[51,646,647],{},"Project expense tracking",[51,649,650],{},"Vendor\u002Fsubcontractor payment records",[51,652,653],{},"Outstanding payment reports",[15,655,69],{"id":68},[11,657,658],{},"Confirm GST invoice formats, accounting rules, approval permissions and any integrations with your accountant or existing accounting software.",[11,660,661,80,663,85],{},[76,662,79],{"href":78},[76,664,84],{"href":83},{"title":87,"searchDepth":88,"depth":88,"links":666},[667,668,669,670,671,672],{"id":609,"depth":88,"text":610},{"id":616,"depth":88,"text":617},{"id":623,"depth":88,"text":624},{"id":630,"depth":88,"text":631},{"id":45,"depth":88,"text":46},{"id":68,"depth":88,"text":69},"Finance & Payments","wallet",[601,101],{},"\u002Ffeatures\u002Ffinance-payment-management",{"title":601,"description":606},"features\u002Ffinance-payment-management","s1fjtWDuusgmy5klkZ-Md3-1FuX_wY_LJv-HqGYrpJE",{"id":682,"title":683,"body":684,"category":755,"description":688,"extension":97,"featured":98,"icon":756,"keywords":757,"meta":758,"navigation":98,"path":759,"seo":760,"stem":761,"__hash__":762},"features\u002Ffeatures\u002Felevator-quotation-management.md","Elevator Quotation Management",{"type":8,"value":685,"toc":747},[686,689,693,696,700,703,707,710,714,717,719,736,738,741],[11,687,688],{},"Organize technical specifications and prepare consistent commercial and technical proposals for elevator enquiries.",[15,690,692],{"id":691},"record-elevator-requirements-in-a-structured-way","Record elevator requirements in a structured way",[11,694,695],{},"Capture lift type, capacity, floors, stops, shaft dimensions, machine configuration, doors and cabin finishes in a repeatable enquiry workflow.",[15,697,699],{"id":698},"keep-commercial-details-connected","Keep commercial details connected",[11,701,702],{},"Bring technical assumptions, proposal details, payment milestones and terms into a coherent quotation process.",[15,704,706],{"id":705},"create-client-ready-documents","Create client-ready documents",[11,708,709],{},"The product scope includes branded quotation PDFs and sharing workflows, subject to configuration and release availability.",[15,711,713],{"id":712},"move-approved-work-forward","Move approved work forward",[11,715,716],{},"A qualified opportunity can move into project execution without rebuilding the entire record from scratch.",[15,718,46],{"id":45},[48,720,721,724,727,730,733],{},[51,722,723],{},"Technical elevator configurator",[51,725,726],{},"Commercial and technical proposal workflow",[51,728,729],{},"Branded PDF generation",[51,731,732],{},"Quotation document history",[51,734,735],{},"Enquiry-to-project conversion",[15,737,69],{"id":68},[11,739,740],{},"Use a product walkthrough to validate the specifications, calculation rules, quotation templates and approval steps required by your business.",[11,742,743,80,745,85],{},[76,744,79],{"href":78},[76,746,84],{"href":83},{"title":87,"searchDepth":88,"depth":88,"links":748},[749,750,751,752,753,754],{"id":691,"depth":88,"text":692},{"id":698,"depth":88,"text":699},{"id":705,"depth":88,"text":706},{"id":712,"depth":88,"text":713},{"id":45,"depth":88,"text":46},{"id":68,"depth":88,"text":69},"Sales & Engineering","file-text",[683,101],{},"\u002Ffeatures\u002Felevator-quotation-management",{"title":683,"description":688},"features\u002Felevator-quotation-management","SNvtpvN6y5Eq65wGDMdjQ6JwzRLdFaJ1n7kS6sNANx8",{"id":764,"title":765,"body":766,"category":837,"description":770,"extension":97,"featured":98,"icon":838,"keywords":839,"meta":840,"navigation":98,"path":841,"seo":842,"stem":843,"__hash__":844},"features\u002Ffeatures\u002Femployee-location-tracking.md","Field Employee Location Tracking",{"type":8,"value":767,"toc":829},[768,771,775,778,782,785,789,792,796,799,801,818,820,823],[11,769,770],{},"Improve operational visibility of field teams with on-duty location workflows and synchronization status.",[15,772,774],{"id":773},"know-where-field-work-is-happening","Know where field work is happening",[11,776,777],{},"A map-based view can help authorized managers understand on-duty team locations when live tracking is enabled.",[15,779,781],{"id":780},"handle-patchy-connectivity","Handle patchy connectivity",[11,783,784],{},"The stated product scope includes offline buffering and synchronization for location records, subject to the app’s implementation.",[15,786,788],{"id":787},"notice-tracking-interruptions","Notice tracking interruptions",[11,790,791],{},"Configured alerts can help administrators investigate missing location updates or revoked permissions.",[15,793,795],{"id":794},"keep-tracking-purposeful","Keep tracking purposeful",[11,797,798],{},"Use clear on-duty boundaries, role restrictions and retention policies to protect employee privacy.",[15,800,46],{"id":45},[48,802,803,806,809,812,815],{},[51,804,805],{},"On-duty location visibility",[51,807,808],{},"Location history where enabled",[51,810,811],{},"Offline buffering and sync status",[51,813,814],{},"Tracking interruption monitoring",[51,816,817],{},"Role-restricted access and policy controls",[15,819,69],{"id":68},[11,821,822],{},"Before deployment, verify device behavior, battery impact, Android\u002FiOS permission rules, background limitations and the exact tracking retention policy.",[11,824,825,80,827,85],{},[76,826,79],{"href":78},[76,828,84],{"href":83},{"title":87,"searchDepth":88,"depth":88,"links":830},[831,832,833,834,835,836],{"id":773,"depth":88,"text":774},{"id":780,"depth":88,"text":781},{"id":787,"depth":88,"text":788},{"id":794,"depth":88,"text":795},{"id":45,"depth":88,"text":46},{"id":68,"depth":88,"text":69},"Workforce Management","map-pin",[765,101],{},"\u002Ffeatures\u002Femployee-location-tracking",{"title":765,"description":770},"features\u002Femployee-location-tracking","fpFfoHpMuqnb_jK38B62tga5hYLkAMIvB95oNq_GnZo",{"id":846,"title":847,"body":848,"category":837,"description":852,"extension":97,"featured":98,"icon":919,"keywords":920,"meta":921,"navigation":98,"path":922,"seo":923,"stem":924,"__hash__":925},"features\u002Ffeatures\u002Fworkforce-attendance.md","Field Workforce Attendance & HRMS",{"type":8,"value":849,"toc":911},[850,853,857,860,864,867,871,874,878,881,883,900,902,905],[11,851,852],{},"Manage staff attendance, shifts, leave and overtime with field-oriented check-in workflows.",[15,854,856],{"id":855},"record-attendance-with-context","Record attendance with context",[11,858,859],{},"The mobile workflow scope includes GPS-based attendance, geofence checks and selfie capture where enabled.",[15,861,863],{"id":862},"apply-consistent-shift-rules","Apply consistent shift rules",[11,865,866],{},"Manage shifts, grace periods, holidays and attendance regularization according to your policy.",[15,868,870],{"id":869},"handle-leave-and-overtime-requests","Handle leave and overtime requests",[11,872,873],{},"Create employee requests and route them through supervisor approval workflows.",[15,875,877],{"id":876},"support-travel-records","Support travel records",[11,879,880],{},"Where enabled, teams can record odometer readings and related travel information.",[15,882,46],{"id":45},[48,884,885,888,891,894,897],{},[51,886,887],{},"GPS and geofence attendance",[51,889,890],{},"Selfie verification workflow",[51,892,893],{},"Shift, holiday and late-arrival rules",[51,895,896],{},"Leave, comp-off and overtime requests",[51,898,899],{},"Odometer and travel records",[15,901,69],{"id":68},[11,903,904],{},"Employee location and attendance policies should be explained clearly and reviewed for applicable privacy and employment requirements before rollout.",[11,906,907,80,909,85],{},[76,908,79],{"href":78},[76,910,84],{"href":83},{"title":87,"searchDepth":88,"depth":88,"links":912},[913,914,915,916,917,918],{"id":855,"depth":88,"text":856},{"id":862,"depth":88,"text":863},{"id":869,"depth":88,"text":870},{"id":876,"depth":88,"text":877},{"id":45,"depth":88,"text":46},{"id":68,"depth":88,"text":69},"user-check",[847,101],{},"\u002Ffeatures\u002Fworkforce-attendance",{"title":847,"description":852},"features\u002Fworkforce-attendance","Vi1SF_IkHpqwxMcPTGZktaRsPGdQYAXLIr0S6avRWOw",{"id":927,"title":928,"body":929,"category":1000,"description":933,"extension":97,"featured":98,"icon":1001,"keywords":1002,"meta":1003,"navigation":98,"path":1004,"seo":1005,"stem":1006,"__hash__":1007},"features\u002Ffeatures\u002Fsecurity-role-management.md","Role-Based Access & Administration",{"type":8,"value":930,"toc":992},[931,934,938,941,945,948,952,955,959,962,964,981,983,986],[11,932,933],{},"Organize access and responsibilities across sales, projects, service, stores, finance and business administration.",[15,935,937],{"id":936},"match-access-to-responsibilities","Match access to responsibilities",[11,939,940],{},"Separate capabilities for business owners, sales teams, project managers, technicians, stores and finance users.",[15,942,944],{"id":943},"make-approvals-accountable","Make approvals accountable",[11,946,947],{},"Route configured task, material and workflow approvals to the right role.",[15,949,951],{"id":950},"keep-notifications-relevant","Keep notifications relevant",[11,953,954],{},"Group operational updates for handoffs, approvals and service activity.",[15,956,958],{"id":957},"review-data-security-as-part-of-rollout","Review data security as part of rollout",[11,960,961],{},"Permission design, credential storage, backups and access reviews should be verified during implementation.",[15,963,46],{"id":45},[48,965,966,969,972,975,978],{},[51,967,968],{},"Role-based access control",[51,970,971],{},"Permissions by user role",[51,973,974],{},"Approval workflows",[51,976,977],{},"Operational notification center",[51,979,980],{},"Access review and security configuration",[15,982,69],{"id":68},[11,984,985],{},"Ask for a walkthrough of your actual roles and approval paths. Security controls should be validated against the deployed application and your organization’s policies.",[11,987,988,80,990,85],{},[76,989,79],{"href":78},[76,991,84],{"href":83},{"title":87,"searchDepth":88,"depth":88,"links":993},[994,995,996,997,998,999],{"id":936,"depth":88,"text":937},{"id":943,"depth":88,"text":944},{"id":950,"depth":88,"text":951},{"id":957,"depth":88,"text":958},{"id":45,"depth":88,"text":46},{"id":68,"depth":88,"text":69},"Administration & Security","shield-check",[928,101],{},"\u002Ffeatures\u002Fsecurity-role-management",{"title":928,"description":933},"features\u002Fsecurity-role-management","7jXOB2CJMxKqTMllT16svT6v8XzAtC_hiRdjYyEUjMc",1793250758605]